Pumping Station of Beichen Bridge Passage –Drainage at the Entrance of National Stadium

Time:2009/8/28 11:04:42

 

 

Pumping Stationg of Beichen Bridge Passage is an auxiliary facility to the Center Axis   Road Overpass Reconstruction Project for the Olympic Area. It employed advanced control system to control drainage pumps to drain the water under Beichen Bridge to  city drainage system quickly, effectively and reliably under severe weather conditions, providing effective warrant to 2008 Beijing Olympic Games.

Type: rain and floods

Main technology: Pumping Station + control systems

Purpuse: to drain the water under Beichen Bridge to city drainage system

Model:EPC